Glow Worm Coordinate Gas Fire Manuals In Pdf
• 221098C.01.99 Installation and Servicing Instructions T o b e l e f t w i t h t h e u s e r G. 3 7 3 1 4 1 4 G. 3 7 3 1 4 1 5 F o r u s e w i t h a s p e c i a l l y d e s i g n e d G l o w - w o r m B a c k B o i l e r U n i t o n l y. • 1 G e n e r a l Sheet Metal Parts If this fire front is to be fitted to a Glow-worm back boiler WITHOUT a combustion products discharge WARNING. When installing or servicing this fire front safety device please read the supplementary instructions care should be taken when handling metal parts at the back of this booklet.
View and Download Glow-worm Homeglow 2 BBU installation & servising instruction online. Homeglow 2 BBU Indoor Fireplace pdf manual download.
• 1 G e n e r a l FLAT AREA FIRE FIXING FACE 289mm 289mm 327mm 327mm 339mm 351mm 351mm 339mm Diagram 1.1 1.3 Data Gas connection- from the service cock Total weight - 49kg Injector - upper Bray 18/180 - lower Bray 18/320 Burner pressure setting. • 1.5 Clearances 1.4 Fire Front Location Restrictions must not be placed around the assembled This fire front can only be fitted to a Glow-worm 45/2 or fire front, see diagram 1.2.
56/2 back boiler unit which itself has been installed in. • 2 T y p e s o f I n s t a l l a t i o n a n d F l u e 2.4 Flue Note. Refer to Section 2 in the Back Boiler Installation Book before starting. The back boiler flue collector assembly accepts the fire front flue spigot. • 3 F i r e F r o n t P r e p a r a t i o n FIRE BODY PACK FIRE BODY ASSEMBLY WALL SEALING PLATE FLUE SPIGOT LITERATURE COMBUSTION CHAMBER FUEL BOTTOM PLATE EFFECT OPULENCE CASING PACK OPUS CASING PACK CANOPY CANOPY. • 3 F i r e F r o n t P r e p a r a t i o n SCREW FRONT LEG M5x30 LEVELLING SCREW SCREW SIDE M5x14 CASTINGS SCREW UPPER WALL M5x40 MOUNTING ANCHOR UPPER WALL MOUNTING SCREW FRONT LEG M5x8.
• 3 F i r e F r o n t P r e p a r a t i o n 3.1 Unpacking The fire front is delivered in two packs, one contains the body assembly, fuel effect pieces and supply tube pack. The other contains the fire front castings, side panels, plinth and loose items pack.
• 3 F i r e F r o n t P r e p a r a t i o n Firefront sensing tube *'C' = Distance from fire fixing wall face to datums Shorten the plain end of the fire front sensing tube by on back boiler air duct. • 4 I n s t a l l a t i o n 4.1 Battery SECURING Remove the fire front from the base tray.
SCREW Take the battery from the fittings pack and fit as shown in 9V ALKALINE diagram 4.1, make sure the terminals are correctly fitted. BATTERY SECURING 4.2 Positioning the Fire Front. • 4 I n s t a l l a t i o n MARK FRONT FRONT FIXING FIXING SCREW SPIGOT HOLES SPIGOT BACK BOILER DUCT FLUE FLUE FIRE FRONT COLLECTOR COLLECTOR ASSEMBLY ASSEMBLY FIRE FRONT Diagram 4.4 SENSING TUBE OLIVE TUBING SECURING SCREW (2) • 4 I n s t a l l a t i o n MOUNTING FIRE FRONT BRACKET TUBE NUT SENSING TUBE TUBE NUT SECURING SCREW (2) 40mm SECURING SCREW (2) Diagram 4.8 ANCHOR LOCK NUT (A) UNION NUT (B) Diagram 4.7 JOINT (C) 4.3 Gas Connection Place the tubing nut and olive, from the loose items. • 4 I n s t a l l a t i o n UPPER SIDE UPPER SIDE FIBRE RETAINING RETAINING R.H. SIDE FIBRE WASHER LOCATING PIN SCREW SCREW PANEL WASHER AND HOLE GAS CONTROL KNOB R.H. SIDE PANEL L.H.
SIDE LOCATING PIN PANEL AND HOLE. • 5 L i g h t i n g, T e s t i n g a n d F i t t i n g o f I n t e r n a l P a r t s 5.1 Lighting and Testing PRESSURE Make sure that the electrical supply to the back boiler is. • 5 L i g h t i n g, T e s t i n g a n d F i t t i n g o f I n t e r n a l P a r t s FUEL EFFECT PIECES LOCATIONS BOTTOM PLATE.
• 5 L i g h t i n g, T e s t i n g a n d F i t t i n g o f I n t e r n a l P a r t s FUEL EFFECT PIECE POSITION 1 FUEL EFFECT PIECE POSITION 4 LOCATION. • 5 L i g h t i n g, T e s t i n g a n d F i t t i n g o f I n t e r n a l P a r t s 5.3 Decorative Castings Fit the front casting as diagram 5.12, decorative side castings as diagram 5.13, front legs and feet as diagram. Download game sao untuk pcare.